November 10, 2020 at 4:18 am #238351Brian EttyParticipant
So I am wrapping up the Inn of the Welcome Wench on the Roof printing now and I am about a third through. I am seriously concerned on the portion that juts out. I have its roof and what should be the connecting roofs but if I align the smaller section over the Corbel overhangs it does not cover the entire smaller section. there is a small gap. When I add the connecting section of the main building aligned to the overhanging with the corbels and there is a half-inch gap.
I included a picture.
Unless I leave the corbels sticking out of the side of the smaller section or somehow the rest of the roof pushes to go beyond its corbels I will need to reconfigure the smaller areas roof.
- This topic was modified 5 years ago by Brian Etty. Reason: side view
- This topic was modified 5 years ago by Brian Etty. Reason: side view
-
March 7, 2021 at 10:21 am #263073MJJEPPERParticipant
I am still printing this one. Did you ever figure it out?
-
July 3, 2021 at 2:22 am #280409Brian EttyParticipant
I was able to add in a single row of the slimmer roof tiles to compensate and it worked out very well. Can’t remember the actual tile designation,. I am still trying to figure out how I am going to paint it all lols.
-
-